CW
VCSS DemonstratorClearwisdom Development Lab, Project 1
00:00:00UTC
Concept demonstrator with simulated data. No real audio or RF signals. Not assessed for operational ATC use — all performance and financial figures are illustrative.
CWP 01
RoleTower west
Sector configurationTWR + GND combined
UserDemo controller
Audio output
Cross-coupling
Press and hold PTT or the Space key to transmit on all TX-selected frequencies. Keys 1–8 select a tile.

Technical supervision

Maintenance engineer view: live topology, voice path quality and failure testing. Inject a failure and watch the effect on the controller console.

Voice path latency—illustrative, not an ED-136 threshold
Jitter—10 s average
Packet loss—active RTP path
System health score100out of 100

Live topology green path = active traffic

Failure injection lab only

Alarms 0 active

    Voice quality, last 60 seconds simulated data

    Latency (ms)Jitter (ms)Failure event

    Recording & evidence

    Every transmission, reception and call is recorded with a UTC timestamp and an integrity hash. Select a segment to replay it, or export the evidence record.

    Timeline, last 5 minutes Recording

    −5 min−4−3−2−1now
    Receive (RX)Transmit (TX)Telephone

    Replay Select a segment on the timeline

    Record integrity

    SHA-256 is computed when a segment is selected.

    Compliance starts with evidence

    Initial applicability register and traceability. No product compliance claims are made in this demo — the statuses show the workflow that will be used.

    Requirements traceability sample baseline

    IDRequirementSourceVerificationStatus

    Standards obligation layers

    Recommended baselineISO/IEC 27001, IEC 62443-4-1, NIST SSDF, ISO/IEC 42001
    Conditional on scopeEMC, electrical safety, SIRIM/MCMC, ED-240B
    Mandatory via CAAM / contractICAO Annex 10 Vol III, 11, 19; ED-136/137/138; ED-153
    Mandatory by lawCivil Aviation Act & CADs; Cyber Security Act 2024 (if NCII); PDPA; MCMC

    Final status is confirmed by CAAM, NACSA and the contract. Standard editions are recorded in the applicability register.

    Lab & delivery roadmap

    Phased development with decision gates. Investment continues only when each gate's conditions are met.

    Master schedule assumes November 2026 start

    Lab capex estimate by phase market ranges

    Total RM216k–770k before quotations. Excludes labour and external testing.

    Lab security zones

    A Voice & testCWPs, nodes A/B, ED-137 simulator, recorder. Isolated.
    B DevelopmentGit, CI, signed artefacts, Vault, SBOM.
    C Internal AILocal LLM, RAG over restricted documents. No egress.
    D ManagementGNSS time, monitoring, SIEM, backup.

    Allowlist firewall between zones. Cloud AI only for classified, approved data.

    Phased investment

    Illustrative figures from Proposal 01 v2 to show the method — not a budget estimate.

    Cumulative net cash flow RM '000, 5 years

    Capital at risk if stopped at a gate RM '000